Advanced Search
HUANG Zhenhua, CHEN Genqi, WANG Shaochun, ZHAO Yinming, CHEN Yan, LI Chengbiao, DU Xu. Analysis of a Case of Multiple Accidents Caused by Grounding of a 10 kV Distribution Network Line[J]. RURAL ELECTRIFICATION, 2024, (7): 42-45, 57. DOI: 10.13882/j.cnki.ncdqh.2024.07.010
Citation: HUANG Zhenhua, CHEN Genqi, WANG Shaochun, ZHAO Yinming, CHEN Yan, LI Chengbiao, DU Xu. Analysis of a Case of Multiple Accidents Caused by Grounding of a 10 kV Distribution Network Line[J]. RURAL ELECTRIFICATION, 2024, (7): 42-45, 57. DOI: 10.13882/j.cnki.ncdqh.2024.07.010

Analysis of a Case of Multiple Accidents Caused by Grounding of a 10 kV Distribution Network Line

  • This article introduces an accident case of a 10 kV line due to a single-phase grounding fault and voltage rise, which resulted in a decrease in the insulation performance of other line cable heads, resulting in a phase to phase short circuit. At the same time, due to the mechanical jamming of the line switch, it was unable to open normally, resulting in a skip trip. The handling process of the story is described in detail, and the cause of the fault is analyzed. Finally, corresponding corrective measures are provided.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return