Advanced Search
WANG Xiaoguang, WANG Zerui, WANG Ziqi, ZHAO Guankun. Analysis and Precontrol Measures of Protection Misoperation in 110 kV Low Resistance Grounding Substation[J]. RURAL ELECTRIFICATION, 2024, (7): 31-35. DOI: 10.13882/j.cnki.ncdqh.2024.07.007
Citation: WANG Xiaoguang, WANG Zerui, WANG Ziqi, ZHAO Guankun. Analysis and Precontrol Measures of Protection Misoperation in 110 kV Low Resistance Grounding Substation[J]. RURAL ELECTRIFICATION, 2024, (7): 31-35. DOI: 10.13882/j.cnki.ncdqh.2024.07.007

Analysis and Precontrol Measures of Protection Misoperation in 110 kV Low Resistance Grounding Substation

  • After the widespread application of low resistance grounding transformer system in 10 kV distribution network system, it was found during operation that if the zero sequence current transformer is wrongly connected and the built-in parameters of the device are not properly adjusted, it will cause hidden dangers of protection misoperation. This article analyzes the hidden dangers in the low rent grounding system of substation grounding transformers, summarizes the hidden danger investigation and rectification ideas of low resistance grounding transformer systems, and formulates hidden danger investigation plans from the aspects of circuit, device parameters, and protection functions. Accumulated technical experience for acceptance and inspection of low resistance grounding systems in substations.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return