Advanced Search

column
Management of "Low Voltage" Station Area in Plateau Agricultural and Pastoral Areas
CUI Guixing, HOU Yuanhong, QU Guangzhi
2022(3): 5-7, 42. DOI: 10.13882/j.cnki.ncdqh.2022.03.001
Abstract PDF
Application Study of High Strength Steel in Transmission Steel Pole with 500 kV Two Circuirs
XIE Zhen
2022(3): 8-12. DOI: 10.13882/j.cnki.ncdqh.2022.03.002
Abstract PDF
Wiring Analysis Method Based on Multifunctional Power Meters Internal Data
LIU Zhengyou, LENG Jianbo, SU Huilin, ZHENG Yan, GAO Yongfeng
2022(3): 13-17. DOI: 10.13882/j.cnki.ncdqh.2022.03.003
Abstract PDF
The Application of Threshold Value of the Phase Angle in Surge Arester Online Test
LIU Zhao, LIU Shengjun, LIU Xiaoyan
2022(3): 18-29, 22. DOI: 10.13882/j.cnki.ncdqh.2022.03.004
Abstract PDF
Analysis and Disposal of Combustible Gas Detector Fault in TA Substation Battery Room
HUANG Xuchao
2022(3): 20-22. DOI: 10.13882/j.cnki.ncdqh.2022.03.005
Abstract PDF
Mal-operation Analysis on Cooling Control Power Failure Protection of 220 kV Transformer
WANG Guolin, ZHANG Fan, YU Wei
2022(3): 23-24. DOI: 10.13882/j.cnki.ncdqh.2022.03.006
Abstract PDF
Analysis of a Repeated Grounding Fault of 10 kV Line
HOU Shaowen, LIU Yihang, HOU Shaofeng
2022(3): 25-26. DOI: 10.13882/j.cnki.ncdqh.2022.03.007
Abstract PDF
Analysis of an Abnormal Action About Backup Automatic Switching After a Fault at Low Voltage Side of 110 kV Main Transformer
ZHANG Zhen, ZHUANG Yan, CHEN Hao, DONG Meiling
2022(3): 27-29. DOI: 10.13882/j.cnki.ncdqh.2022.03.008
Abstract PDF
Analysis of Jamming of High Voltage Bushing Cap in 220 kV Substation
XING XuLiang, ZHOU Gang, WANG Jing, CHEN BinChao, WANG WeiJia
2022(3): 30-32. DOI: 10.13882/j.cnki.ncdqh.2022.03.009
Abstract PDF
Feasibility Study on Audio On-line Monitoring Method of Circuit Breaker Operating Mechanism
YU Siyuan, HU Yunbin, ZHOU Hanping, JIANG Shan
2022(3): 33-37. DOI: 10.13882/j.cnki.ncdqh.2022.03.010
Abstract PDF
Analysis of Secondary System Online Monitoring Technology Application Examples Based on Intelligent Recorder in 500 kV Smart Substations
CHEN Tao
2022(3): 38-42. DOI: 10.13882/j.cnki.ncdqh.2022.03.011
Abstract PDF
Reserch on Monitoring Process Level of High Precision Time Synchronization Device
WANG Lin, LIU Hanning, JI Shuaihu
2022(3): 43-46. DOI: 10.13882/j.cnki.ncdqh.2022.03.012
Abstract PDF
Common Faults and Operation and Maintenance Optimization of Power Distribution Automation Terminal
CHEN Yiming
2022(3): 47-49. DOI: 10.13882/j.cnki.ncdqh.2022.03.013
Abstract PDF
Design of Underground Power Supply Monitoring System in Coal Mine
CHEN Yaohui, MA Xinghe
2022(3): 50-52. DOI: 10.13882/j.cnki.ncdqh.2022.03.014
Abstract PDF
Development of a Fast Power up Instrument for Electric Energy Meter in Power Supply Station Meter Storehouse
HU Yichuan, SUN Zhichao
2022(3): 53-57. DOI: 10.13882/j.cnki.ncdqh.2022.03.015
Abstract PDF
A Combined Tool for Electrical Equipment Operation
FU Yi
2022(3): 58-60. DOI: 10.13882/j.cnki.ncdqh.2022.03.016
Abstract PDF
Safety Design and Operation Safety Measures for Energy Storage System of Charging Station
ZHANG Yanzi, OU Fanghao, SUN Sijia, WANG Jianxing
2022(3): 61-65. DOI: 10.13882/j.cnki.ncdqh.2022.03.017
Abstract PDF
Development History and Research Significance of Affordable Photovoltaic Power Station
LI Xiaolong
2022(3): 66-70. DOI: 10.13882/j.cnki.ncdqh.2022.03.018
Abstract PDF
Application Research on Dynamic Reactive Power Compensation of Power Grid at the Receiving End
WANG Chenhao
2022(3): 71-73. DOI: 10.13882/j.cnki.ncdqh.2022.03.019
Abstract PDF
Design and Research of Fast Wiring Device for Grounding Resistance Detectionc
YU Dong, CAI Jiawei, LIN Xiaofei, ZHENG Zhen, ZHENG Jianhua
2022(3): 74-76. DOI: 10.13882/j.cnki.ncdqh.2022.03.020
Abstract PDF
Research and Application of Pre Twisted Insulated Binding Wire for Overhead Insulated Line in Power Distribution Network
TANG Jing, YANG Haolong
2022(3): 77-78, 82. DOI: 10.13882/j.cnki.ncdqh.2022.03.021
Abstract PDF
High Efficiency Prevention and Control of Small Batch New Erected Series Customer Error Connection
WANG Yuerong
2022(3): 79-80. DOI: 10.13882/j.cnki.ncdqh.2022.03.022
Abstract PDF
Optimization Designs of Substation Equipment Differentiation Operation and Maintenance Tactics
HONG Zimin
2022(3): 81-82. DOI: 10.13882/j.cnki.ncdqh.2022.03.023
Abstract PDF
Analysis and Improvement Scheme of Major Safety Hidden Trouble in HPL550B2 Circuit Breaker Switching Circuit
XIANG Yang, HUANG Gang
2022(3): 83-84. DOI: 10.13882/j.cnki.ncdqh.2022.03.024
Abstract PDF
Analysis of Resident Customers' Choice Strategy under the Electricity Price Policy of One Household with Multiple Population
XIE Qiyang
2022(3): 85-86. DOI: 10.13882/j.cnki.ncdqh.2022.03.025
Abstract PDF
Technical Scheme and Precautions for Maintenance and Replacement of Switch in Substation
XU Dexiang
2022(3): 87-89. DOI: 10.13882/j.cnki.ncdqh.2022.03.026
Abstract PDF
Treatment and Analysis of SF6 Gas Leakage from a 110 kV Circuit Breaker
SHANG Jiacheng
2022(3): 90-91. DOI: 10.13882/j.cnki.ncdqh.2022.03.027
Abstract PDF
Administering Method of 10 kV Line Loss Abnormity Based on Integrative Electricity Quantity and Line Loss Management System
LI Hongping, ZHANG Hao
2022(3): 92-93. DOI: 10.13882/j.cnki.ncdqh.2022.03.028
Abstract PDF
Superposition Scheme Comparison of Common Demand Suited to Multiple Circuit Power Supply Customer
LIANG Jie, LIANG Guangming, HUANG Shuilian
2022(3): 94-95. DOI: 10.13882/j.cnki.ncdqh.2022.03.029
Abstract PDF