孙钦斐, 王瀚秋, 李干, 马凯, 李香龙. 农村地区“煤改电”增量负荷计算及户均配变容量配置方法研究[J]. 农村电气化, 2023, (11): 77-82. DOI: 10.13882/j.cnki.ncdqh.2023.11.024
引用本文: 孙钦斐, 王瀚秋, 李干, 马凯, 李香龙. 农村地区“煤改电”增量负荷计算及户均配变容量配置方法研究[J]. 农村电气化, 2023, (11): 77-82. DOI: 10.13882/j.cnki.ncdqh.2023.11.024
SUN Qinfei, WANG Hanqiu, LI Gan, MA Kai, LI Xianglong. Research on the Calculation Method of Incremental 'Coal to Electricity' Load and Average Distribution Transformer Capacity[J]. RURAL ELECTRIFICATION, 2023, (11): 77-82. DOI: 10.13882/j.cnki.ncdqh.2023.11.024
Citation: SUN Qinfei, WANG Hanqiu, LI Gan, MA Kai, LI Xianglong. Research on the Calculation Method of Incremental 'Coal to Electricity' Load and Average Distribution Transformer Capacity[J]. RURAL ELECTRIFICATION, 2023, (11): 77-82. DOI: 10.13882/j.cnki.ncdqh.2023.11.024

农村地区“煤改电”增量负荷计算及户均配变容量配置方法研究

Research on the Calculation Method of Incremental 'Coal to Electricity' Load and Average Distribution Transformer Capacity

  • 摘要: 配电网规划是“煤改电”配电网可靠运行的根本保障,但“煤改电”负荷作为一种增量负荷,其户均配变容量目前尚无标准,配电网规划设计缺少基本依据。针对该问题,文章提出一种“以热定电”计算农村“煤改电”增量负荷及户均配变容量的方法,即以采暖热负荷需求确定“煤改电”增量负荷与户均配变容量,从而为“煤改电”配网规划和设备选型提供依据。并以北京地区典型居民住宅为例,采用建筑环境模拟软件DeST仿真计算房屋采暖所需热负荷,根据电采暖设备类型,最终给出北京地区农村“煤改电”用户户均配变容量。

     

    Abstract: Distribution network planning is the basis to guarantee reliable operation of "Coal to Electricity"('C2E') distribution network. While, as a kind of incremental load, there is no standard about average transformer capacity for each 'C2E' consumer. As a result, 'C2E' distribution network planning and design lacks basic rules. Aimed at this problem, a method named ‘Heat load to Electricity load’ for calculating 'C2E' incremental load and average transformer capacity per consumer was proposed in this paper, which provides basis to 'C2E' distribution network and electrical equipment selection. With this method, 'C2E' electrical load and average transformer capacity is determined by heating load of building in demand side. An example with typical residential building in Beijing was taken in this paper. Heating load of building was calculated using DeST (Designer's Simulation Toolkits) firstly. Then, with the kind of electrical heating equipment, average transformer capacity for each 'C2E' consumer in Beijing rural area was given.

     

/