文兴. 高原风电场架空线路冰雪灾害治理研究[J]. 农村电气化, 2023, (11): 10-13. DOI: 10.13882/j.cnki.ncdqh.2023.11.005
引用本文: 文兴. 高原风电场架空线路冰雪灾害治理研究[J]. 农村电气化, 2023, (11): 10-13. DOI: 10.13882/j.cnki.ncdqh.2023.11.005
WEN Xing. Research on Ice and Snow Disaster Management of Overhead Lines in Gaoyuan Wind Farm[J]. RURAL ELECTRIFICATION, 2023, (11): 10-13. DOI: 10.13882/j.cnki.ncdqh.2023.11.005
Citation: WEN Xing. Research on Ice and Snow Disaster Management of Overhead Lines in Gaoyuan Wind Farm[J]. RURAL ELECTRIFICATION, 2023, (11): 10-13. DOI: 10.13882/j.cnki.ncdqh.2023.11.005

高原风电场架空线路冰雪灾害治理研究

Research on Ice and Snow Disaster Management of Overhead Lines in Gaoyuan Wind Farm

  • 摘要: 高原风电场架空输电线路冬季覆冰造成的损失较大,常会发生过荷载、冰闪、舞动、脱冰跳跃等现象,导致线路跳闸、断线、倒塔和通信中断等事故。通过近3年的技术研究和不断改进试验,研发了针对高原风电场特有的线路脱冰防跳跃措施和直流融冰方案,该方案能有效治理高原风电场架空线路因冰雪灾害造成的影响。

     

    Abstract: The overhead transmission lines of Gaoyuan Wind Farm suffer significant losses due to icing in winter. Overloading, ice flashing, dancing, and jumping off ice often occur, leading to accidents such as line tripping, disconnection, tower collapse, and communication interruption. Through nearly 3 years of technical research and experimental improvement, we have developed line deicing and anti jumping measures and DC ice melting solutions specific to the Gaoyuan Wind Farm. This plan can effectively address the impact of ice and snow disasters on the overhead lines of Gaoyuan Wind Farm.

     

/