王润琪, 张心语, 高超, 于立叁, 蓝骞, 郎野村. 架空输电线路工程的质量控制要点与对策分析[J]. 农村电气化, 2023, (11): 1-2, 64. DOI: 10.13882/j.cnki.ncdqh.2023.11.001
引用本文: 王润琪, 张心语, 高超, 于立叁, 蓝骞, 郎野村. 架空输电线路工程的质量控制要点与对策分析[J]. 农村电气化, 2023, (11): 1-2, 64. DOI: 10.13882/j.cnki.ncdqh.2023.11.001
WANG Runqi, ZHANG Xinyu, GAO Chao, YU Lisan, LAN Qian, LANG Yecun. Analysis of Key Issues and Countermeasures for Quality Control of Overhead Transmission Lines Engineering[J]. RURAL ELECTRIFICATION, 2023, (11): 1-2, 64. DOI: 10.13882/j.cnki.ncdqh.2023.11.001
Citation: WANG Runqi, ZHANG Xinyu, GAO Chao, YU Lisan, LAN Qian, LANG Yecun. Analysis of Key Issues and Countermeasures for Quality Control of Overhead Transmission Lines Engineering[J]. RURAL ELECTRIFICATION, 2023, (11): 1-2, 64. DOI: 10.13882/j.cnki.ncdqh.2023.11.001

架空输电线路工程的质量控制要点与对策分析

Analysis of Key Issues and Countermeasures for Quality Control of Overhead Transmission Lines Engineering

  • 摘要: 随着城镇化步伐的加速,社会对电力供应的要求日益提高。架空输电线路成为电力工程建设项目的重要组成部分,施工环节中的质量管控直接决定设备投产后的安全稳定运行。架空输电线路施工管理存在着复杂性和系统性问题,对工程技术人员的要求也很高,因此,必须做好对架空输电线路施工管理问题的研究,强化对工程的质量过程管理,严抓标准工艺应用率、三级质检完成率,以提高工程建设管理的规范性。在工程项目前期阶段,必须严格履行各级交底制度以及施工工期的排定工作;在建设实施过程,必须保证各分部分项工程质量管控,严抓标准工艺卡的应用,克服建设实施阶段中可能出现的各种困难,从而整体提高了架空输电线路施工管理的效率。

     

    Abstract: With the acceleration of urbanization, the demand for electricity supply in society is increasing day by day. Overhead transmission lines have become an important component in power engineering construction projects. Quality control directly determines the safe and stable operation of equipment. There exit complex and systematic issues in the construction management, and the requirements for engineering and technical personnel are also high. Therefore, it is necessary to make research on construction management of overhead transmission lines so as to strengthen quality process administration of the project, strictly control application rate of standard processes as well as completion rate of three-level quality inspection, thus the standardization of engineering construction management can be improved. In the early stage, it is of necessity to strictly adhere to the disclosure system at all levels and schedule the construction period. During construction, quality control of each sub project must be ensured and application of standard process cards should be grasped. In this way, various difficulties can be overcome that may arise during the implementation stage and the overall efficiency of overhead transmission line construction management can be effectively enhanced.

     

/