输电线路作业现场数字化勘察技术研究

Research on Digital Survey Technology for Transmission Line at Working Site

  • 摘要: 输电线路作业前应根据任务组织现场勘察。针对传统勘察方法中存在的问题,提出一种数字化勘察技术。利用无人机巡视和激光雷达扫描进行数据采集,对采集数据进行解算、特征提取和分类后建立杆塔和线路的三维建模。同时,也可以建立基于倾斜摄影的三维模型。结果表明,应用数字化勘察技术可以实现精准掌握检修设备状态、现场环境和作业需求,提前识别现场可能的安全风险。

     

    Abstract: Site survey should be organized according to the task before the transmission line work. Aiming at solving the problems existing in traditional survey methods, a digital survey technology is proposed. Data acquisition is carried out by unmanned aerial vehicle (UVA) patrolling and light detection and ranging (LiDAR) scanning, and 3-dimension (3D) modelling of the tower and line ARE established after the calculation, feature extraction and classification of the acquired data. Meanwhile, 3D modeling can also be established based on tilted photography. The results show that the application of digital survey technology can achieve precise mastery of the state of overhaul equipment, site environment and operational needs, and identify possible safety risks at the site in advance.

     

/

返回文章
返回