110 kV双母线母差保护技术改造施工方案探讨

Discussion on Construction Scheme of 110 kV Double Bus Differential Protection Technical Transformation

  • 摘要: 110 kV双母线母差保护技术改造是变电站二次系统改造工程项目中常见分项内容,文章提出了110 kV双母线母差保护技术改造可行的5种施工方案,并以某变电站具体施工条件下存在的风险为例分析了各方案的优缺点,再通过专家投票方式选出了适合施工条件的最优方案,并提出了该方案的风险预控要点。文章对110 kV双母线母差保护技术改造方案中的风险分析和控制具有一定的参考价值。

     

    Abstract: The differential protection technical transformation of 110 kV double busbar is a common subitem in the secondary system renovation project of substation. Five feasible construction schemes of 110 kV double busbar differential protection technology are presented in the paper. And taking the risks that exist under specific construction conditions of substation as an example, the advantages and disadvantages of each scheme are analyzed. Finally, the optimal solution suitable for construction conditions is selected by expert voting, and the key points for risk prevention and control under this scheme is proposed. The paper has certain reference value for risk analysis and control in the transformation scheme of 110 kV double busbar differential protection technology.

     

/

返回文章
返回