秦彬, 杨克难, 潘振东, 闫存恒, 侯靖岩, 张海宾, 陈琳. 220 kV变压器中压侧中性点经小电抗接地的运行分析[J]. 农村电气化, 2024, (1): 25-27. DOI: 10.13882/j.cnki.ncdqh.2024.01.007
引用本文: 秦彬, 杨克难, 潘振东, 闫存恒, 侯靖岩, 张海宾, 陈琳. 220 kV变压器中压侧中性点经小电抗接地的运行分析[J]. 农村电气化, 2024, (1): 25-27. DOI: 10.13882/j.cnki.ncdqh.2024.01.007
QIN Bin, YANG Kenan, PAN Zhendong, YAN Cunheng, HOU Jingyan, ZHANG Haibin, CHEN Lin. Operation Analysis of Neutral Point on Medium Voltage Side of 220 kV Transformer with Small Reactance Grounding[J]. RURAL ELECTRIFICATION, 2024, (1): 25-27. DOI: 10.13882/j.cnki.ncdqh.2024.01.007
Citation: QIN Bin, YANG Kenan, PAN Zhendong, YAN Cunheng, HOU Jingyan, ZHANG Haibin, CHEN Lin. Operation Analysis of Neutral Point on Medium Voltage Side of 220 kV Transformer with Small Reactance Grounding[J]. RURAL ELECTRIFICATION, 2024, (1): 25-27. DOI: 10.13882/j.cnki.ncdqh.2024.01.007

220 kV变压器中压侧中性点经小电抗接地的运行分析

Operation Analysis of Neutral Point on Medium Voltage Side of 220 kV Transformer with Small Reactance Grounding

  • 摘要: 北京电网分区运行,其中枢纽站的接地方式关系整个电网运行,K分区中的A变电站采用220 kV变压器中压侧中性点经小电抗接地的运行方式。分析了该分区的主变中性点接地情况、A变电站的等值网络,同时计算了A变电站的短路容量、不同主变并列运行时的单相短路电流,计算表明,中性点经小电抗接地后可降低其单相短路电流,满足设备热稳定性要求。同时提出中性点小电抗投运后对现场运行、倒闸操作的要求。

     

    Abstract: The operation of the Beijing power grid is divided into zones, and the grounding method used at the hub station has a significant impact on the overall operation of the electrical grid. In the K zone, the A substation adopts the operating mode of grounding the medium-voltage side neutral point of the 220 kV transformer through a small reactance. This article analyzes the neutral point grounding situation of the main transformer in this zone and the equivalent network of the A substation. It also calculates the short-circuit capacity of the A substation and the single-phase short-circuit current when different main transformers are operated in parallel. The calculation shows that grounding the neutral point through a small reactance can reduce the single-phase short-circuit current and meet the requirements for equipment thermal stability. The article also proposes the operational and switching requirements when the neutral point small reactance is put into operation.

     

/