缩短低压发电车保电现场准备工作时间

Shorten the Preparation Time of Low-voltage Generation Car for Power Protection

  • 摘要: 台区工程作业带来的频繁停电问题给客户造成了极大的影响,为了提高供电可靠性,采用低压发电车进行保电是常用的重要手段。目前低压发电车现场保电准备工平均用时为20.6 min,不满足公司优质生产目标15 min的要求。QC小组通过寻找问题症结与要因,并制订相应对策,使得保电现场准备工作用时缩短至9.9 min,实现目标的同时提升了保电速率。

     

    Abstract: The frequent power failure caused by the engineering operation in the substation area has influenced greatly on the production and life of residents. In order to improve the reliability of power supply, the use of low-voltage generator cars for power protection is an important means in common use. At present, the average time for the on-site electricity preservation preparation of the low-voltage generator car is 20.6 minutes, which does not meet the requirements of the company's high-quality production target of 15 minutes. The QC team shortened the time for the preparation of the electricity conservation site to 9.9 minutes by finding the crux of the problem and the main cause, and formulated corresponding countermeasures, achieving the goal while improving the electricity conservation rate.

     

/

返回文章
返回