高级检索

配电自动化罩式FTU免登杆操作杆的研制

Development of Non Climbing Lever for Distribution Automation Hood Type FTU

  • 摘要: 为提高配电线路自动化水平,目前配电线路FTU数量激增,相关运维工作量大大增加。由于现有罩式FTU的运维方式存在准备过程较烦琐,占用时间较长,影响作业效率;作业人员存在高处跌落风险;现场环境复杂,在某些天气或地形下较难或无法登杆等问题。介绍了一种配电自动化罩式FTU免登杆操作杆的研制过程。此装置可简化配电自动化罩式FTU的运维流程、提高作业效率,且能提高运维人员的作业安全水平。

     

    Abstract: In order to improve the automation level of distribution lines, the number of FTU of distribution lines has increased sharply, and the workload of relevant operation and maintenance has increased greatly. The existing operation and maintenance mode of hood type FTU has the following problems: the preparation process is cumbersome, the time is long and the efficiency is low; Operators have the risk of falling from height; The site environment is complex, and it is difficult or impossible to climb the pole in some weather or terrain. This paper introduces the development process of a kind of non climbing lever for distribution automation hood type FTU. This device can simplify the operation and maintenance process of distribution automation FTU, and improve the operation efficiency and the operation safety level of operation and maintenance personnel.

     

/

返回文章
返回