  • 摘要: 从110 kV梅南站2#主变现状出发,分析开关检修更换中的注意事项,并在该基础上形成科学、规范的变中开关检修更换施工方案。同时,针对110 kV梅南站2#主变变中开关检修更换风险要素,开展全周期安全管控,为变电站施工管控提供相应参考。

     

    Abstract: Starting from the current situation of 110 kV Meinan station 2# main transformer, this paper analyzes the precautions in the maintenance and replacement of switches in the transformer, and forms a scientific and standardized construction scheme for the maintenance and replacement of switches in the transformer based on this. At the same time, for the risk factors of switch maintenance and replacement in 110 kV Meinan station 2# main transformer, carry out full cycle safety management and control, so as to provide corresponding reference for substation construction management and control.

     

/