220 kV变电站主变高压套管将军帽发热卡涩事件分析

Analysis of Jamming of High Voltage Bushing Cap in 220 kV Substation

  • 摘要: 分析了一起某220 kV变电站主变高压套管将军帽发热卡涩事件。通过现场分析,结合一次设备的历史检查数据、设备历史巡视记录和红外测温记录,根据前期该类型设备发生类似异常的原因进行事故分析总结。M型结构套管将军帽与引线接头间采用螺纹连接,主载流面为螺纹接触面,该结构对安装工艺要求较高,长期运行过程中在振动作用下套管引线接头与将军帽结合部位接触不良,造成该位置电阻增大,引起局部过热。此次事件发生的原因不仅与设备运行环境的振动有关,还与局部过热导致设备本身氧化有关。针对此类事件分析并提出了加强M型套管备品储备、加强状态监测等手段,提高了变电站稳定安全运行的能力。

     

    Abstract: This paper analyzes a case of heating jamming of high voltage bushing cap of main transformer in a 220 kV substation. Through on-site analysis, combined with the historical inspection data of primary equipment, equipment historical patrol records and infrared temperature measurement records, the accident is analyzed and summarized according to the causes of similar abnormalities of this type of equipment in the early stage. The cause of this event is not only related to the vibration of the equipment operating environment, but also related to the oxidation of the equipment itself caused by local overheating. This paper analyzes and puts forward treatment and improvement measures for such events, so as to avoid the recurrence of such events and improve the ability of stable and safe operation of substation.

     

/

返回文章
返回